The Nutz & Boltz of it...
1. As a student of SA 132 you need to check into our class blog SP2020CazSA132.blogspot.com between the hours of 9 am and 6 PM on M W & F and to our blog and FaceBook Class Group site, minimum.
Make note of this in your personal calendars.
2. I will alert you to any new updates to our blog pages through your CAZ email as I post them.
This is your responsibility alone to keep a close eye on your email.
3. Each Friday I will check to make sure your Virtual Sketchbook Entries have been loaded with full details completed from the assignment.
* This includes your comments on your colleague's works.
From the Rubric #6. The student thoughtfully considered and completed 5 written entries (minimum) of others' entries, beyond “I like this work! It’s cool Scooby Doo”
Please re-read the already published Virtual Sketchbook Rubric carefully to fully understand this assignment so you know you are completing it to the best of your ability.
Mark your calendars when each Virtual Sketchbook Entry trio are due and published to our FB.site, they are as follows:
MAR 27 = 27 entries of 40
APR 03 = 30
APR 10 = 33
APR 17 = 36
APR 24 = 39
MAY 01 = 40
4. Make sure to comply with all DUE dates. Should you not understand something or are having problems with anything you need to pose those questions to me by email at jpepper@cazenovia immediately.
5. You have two research papers to complete.
There are four studio projects to complete for the course. They include Project #4 Cardboard Construction, Project #5 FRACTIONS + Upcycles> FAKE NATURE > Wearables, Project #6 Site-Specific Installation inspired by Andy Goldsworthy and Project #7 the Student Directed Final Project. Thus, as you can see I have added one short project into the mix from our original course calendar.
5. You have two research papers to complete.
And a creative response to the Fischli & Weiss film "The Way things Go".
6. Below is our new Course Calendar, please follow it.
----------------------------------------------------------------------------
WK #9
INFO Project #4
Cardboard Construction
See new rules to the already published assignment page.
Project #4 DUE DATE = FRI APR 3rd by 6 PM
Your uploads to FBsite need to include the following
i. Upload 3 works-in-progress images (see below for dates)
Followed by ii through vii, once your project has been completed:
i. Upload 3 works-in-progress images (see below for dates)
Followed by ii through vii, once your project has been completed:
ii. Upload 4 images of your completed project from different perspectives
iii. Upload 1 video not to exceed 90 seconds of your completed work: Be playful with your construction. Place it in different environments inside and out.
Create an interesting video of your playful actions not to exceed 1.5 minutes
iv. Put details of your construction project in the comment area including:
Overall size > Height x length x depth in inches
v. Materials used
vi. What kind of adhesives did you use?
vii. Upload one image from your sketchbook of your inspirational source with title and artist/designer if applicable
MON MAR 23 @ 6 PM
- I know that most of you are already working on both Project #4 and Project #5 simultaneously. Please continue to do that.
- Check into the Blog to make sure you have read all new class notes and assignments
- Check into FBsite and follow any new prompts posted
- Upload 1 work-in-progress image onto FBsite
Research Paper #1/2 Due to PEPPER TUESDAY, MAR 24th @ 6 PM to jpepper@cazenovia.edu
In the subject of your email and document's file name put: Your last name / 1/2 Word.doc only
WED MAR 25 @ 6 PM
- Upload 1 works-in-progress image onto FBsite
- Work on Project #4 Cardboard Constructions
- Work on Project #5 FRACTIONS, UPcycles, FAKEnature
- WATCH Fischli and Weiss' video The Way Things Go assignment on our blog
1987 29.39 minutes and follow the assignment prompts DUE MON MAR 30
FRI MAR 27 @ 6 PM
- DUE 27 virtual sketchbook entries of #40 total
- Work on Project #4 Cardboard Constructions
- Work on Project #5 FRACTIONS, UPcycles, FAKEnature
- Upload 1 works-in-progress image of Project #4 and Project #5 onto FBsite
- Work on Project #5 FRACTIONS, UPcycles, FAKEnature
- Upload 1 works-in-progress image of Project #4 and Project #5 onto FBsite
WK #10
MON MAR 30 @ 6 PM
- Check into Blog to make sure you have read all new class notes and assignments
- Check into FBsite and follow any new prompts
- DUE The Way Things Go assignment
- DUE The Way Things Go assignment
- Work on Project #4 Cardboard Constructions
- Work on Project #5 FRACTIONS, UPcycles, FAKEnature
- Work on Project #5 FRACTIONS, UPcycles, FAKEnature
WED APR 01 @ 6 PM
- Upload 2 works-in-progress images onto FBsite that shows clear advancement in both of your Project #4 and Project #5
- Upload a multi media presentation of your Research paper #1/2 artist. This needs to include 5 separate images and may be completed as a:
- still image upload
- a video upload
- a voice over combined with imagery
- Be inventive!
- Be creative!
FRI APR 03 @ 6 PM
- DUE 30 virtual sketchbook entries of #40 total
- DUE Project #4 COMPLETED with all uploads required onto FBsite
- DUE Project #4 Talking Points from assignment completed on FBsite
- DUE Minimum of 4 in-process sketches / drawings / collages uploaded to FBsite for Project #5
INFO Project #5 continue to work on
FRACTIONS + Upcycles> FAKE NATURE > Wearables
DUE DATE = FRI APR 17th
Your uploads to FBsite need to include the following:
i. Upload 3 works-in-progress images (see below for dates)
Followed by ii through ix, once your project has been completed:
i. Upload 3 works-in-progress images (see below for dates)
Followed by ii through ix, once your project has been completed:
ii. Upload 4 images of your Project #5 from different perspectives
iii. Upload 1 video not to exceed 150 seconds
iv. Put details of your project in the comment area including:
Size > Height x length x depth in inches
v. Materials used
vi. Location of site from your video
vii. Performer's name (may include your pet, yourself and/or younger sibling)
viii. Upload two images from your inspirational source with title and artist/designer
ix. Minimum of 4 in-process sketches / drawings / collages for Project #5
WK #11
MON APR 06 @ 6 PM
- Check into Blog to make sure you have read all new class notes and assignments
- Check into FBsite and follow any new prompts
INFO ** PEPPER WILL INTRODUCE Project #6
INFO ** PEPPER WILL INTRODUCE Project #6
Nature Inspired Interruptions & Interfacings
Working with and from the Earth, a Site-specific Installation
Andy Goldsworthy inspired.
Weather permitting, this is a two week assignment that will commence in WK #13 and be completed on FRI APR 24
@ 6 PM
Weather permitting, this is a two week assignment that will commence in WK #13 and be completed on FRI APR 24
@ 6 PM
When the weather gets better I want people to go outside and make use of natural materials for site specific installations
The Earth is bountiful!
- Work on Project # 5 FRACTIONS, UPcycles, FAKEnature
- Upload 1 work-in-progress image of this assignment you are working onto FBsite
WED APR 08 @ 6 PM
- Complete your critique points for 5 (minimum) of your colleagues' Project #4 works.
In them, be thorough, be thoughtful, be mindful of all that we've learned. Include discussion of formal principle and design elements that are operating in the work.
Upload to FBsite
- Work on Project # 5 FRACTIONS, UPcycles, FAKEnature
- Upload 1 work-in-progress image of Project #5 you are working onto FBsite
INFO *** PEPPER WILL Re-INTRODUCE Project #7
Student Directed Final Project ON MONDAY APR 13th due during exam week.
You in-process images should not be shared with the group.
Instead, we will do a BIG REVEAL to share with all during the Final Exam.
Instead, we will do a BIG REVEAL to share with all during the Final Exam.
FRI APR 10 @ 6 PM
DUE 33 virtual sketchbook entries DUE of #40 totalDUE Your creative response to Fischli and Weiss' video The Way Things Go launched to FBsite This needs to include your response comments and imagery that may be completed as a:
- still image(s) upload
- a video upload
- a voice over combined with imagery
- Be inventive!
- Be creative!
Pepper reintroduced Project #6 Nature Inspired - check blog page on assignment
WK #12
MON APR 13 @ 6 PM
- Check into Blog to make sure you have read all new class notes and assignments
- Check into FBsite and follow any new prompts
- Work on Project #5 FRACTIONS, UPcycles, FAKEnature
- Work on Project #6 Site Specific Installation
- Work on Project #6 Site Specific Installation
- Upload 1 work-in-progress image of Project #5 and #6 assignments you are working onto FBsite
WED APR 15 @ 6 PM
- Work on Project #5 FRACTIONS, UPcycles, FAKEnature
- Work on Project #6 Site Specific Installation
- Work on Project #7 Student Directed Final Project
- Work on Project #5 FRACTIONS, UPcycles, FAKEnature
- Work on Project #6 Site Specific Installation
- Work on Project #7 Student Directed Final Project
FRI APR 17 @ 6 PM
- DUE 36 virtual sketchbook entries of #40 total
- DUE Project #5 FAKE NATURE COMPLETED
- DUE Project #5 COMPLETED with all uploads required onto FBsite
- DUE Project #5 Talking Points from assignment completed on FBsite
- DUE Minimum of 4 in-process sketches / drawings / collages uploaded to FBsite for Project #6
- DUE 200 word proposal for Project #6 Nature Inspired due FRI APR 17 by 6 PM
- DUE Minimum of 4 in-process images of Project #7 sent to jpepper@cazenovia.edu. In them, there should be clear evidence of the advancement in this Final Project of SA132.
- Private conference FaceTime, Skype, phone call, etc. with Pepper regarding Project #7
Do not share them with the group!
- DUE 200 word proposal for Project #6 Nature Inspired due FRI APR 17 by 6 PM
- DUE Minimum of 4 in-process images of Project #7 sent to jpepper@cazenovia.edu. In them, there should be clear evidence of the advancement in this Final Project of SA132.
- Private conference FaceTime, Skype, phone call, etc. with Pepper regarding Project #7
Do not share them with the group!
WK #13
MON APR 20 @ 6 PM
- Check into Blog to make sure you have read all new class notes and assignments
- Check into FBsite and follow any new prompts
- Weather permitting* work on Project #6 SITE SPECIFIC INSTALLATION
- Upload 1 work-in-progress image of each assignment you are working onto FBsite
WED APR 22 @ 6 PM
Upload to FBsite
- Work on Project #6 SITE SPECIFIC INSTALLATION
- Upload 1 work-in-progress image of each assignment you are working onto FBsite
- DUE Complete your critique points for 5 (minimum) of your colleagues' Project #5 works. In them, be thorough, be thoughtful, be mindful of all that we've learned. Include discussion of formal principle and design elements that are operating in each work. Upload to FBsite
FRI APR 24 @ 6 PM
- DUE 39 virtual sketchbook entries of #40 total
- DUE Project #6 COMPLETED with all uploads required onto FBsite
- DUE Project #6 Talking Points from assignment completed on FBsite
WK #14
MON APR 27 @ 6 PM
- Check into Blog to make sure you have read all new class notes and assignments
- Check into FBsite and follow any new prompts
- Work on FINAL PROJECT #7 > NO work-in-progress images to be loaded to FBsite
The BIG REVEAL will be during our Final Exam. This way your final project is kept under wraps.
- Private conference FaceTime, Skype, phone call, etc. with Pepper regarding Project #7
Do not share them with the group.
The BIG REVEAL will be during our Final Exam. This way your final project is kept under wraps.
- Private conference FaceTime, Skype, phone call, etc. with Pepper regarding Project #7
Do not share them with the group.
WED APR 29 @ 6 PM
- DUE Complete your critique points for 5 (minimum) of your colleagues' Project #6 works. In them, be thorough, be thoughtful, be mindful of all that we've learned. Include discussion of formal principle and design elements that are operating in each work.
Upload to FBsite
- Have a private conference FaceTime, Skype, phone call, etc. with Pepper regarding Project #7 Do not share them with the group!
- DUE Complete your critique points for 5 (minimum) of your colleagues' Project #6 works. In them, be thorough, be thoughtful, be mindful of all that we've learned. Include discussion of formal principle and design elements that are operating in each work.
Upload to FBsite
- Have a private conference FaceTime, Skype, phone call, etc. with Pepper regarding Project #7 Do not share them with the group!
FRI MAY 01 @ 6 PM
DUE 40 virtual sketchbook entries of #40 total
DUE Research Paper #2/2 completed send to jpepper@cazenovia.edu
DUE Research Paper #2/2 completed send to jpepper@cazenovia.edu
- Upload a multi media presentation of your Research paper #2/2 artist.
This needs to include 5 separate images and may be completed as a:
- still image upload complete with information
- a video upload complete ""
- a voice over combined with imagery complete ""
- Be inventive!
- Be creative!
- Private conference FaceTime, Skype, phone call, etc. with Pepper regarding Project #7
Do not share them with the group.
OUR FINAL PROJECT #7 will be shared with the students of SA132. FRI - TUE MAY 1 - 5 Final Exam Week
Scheduled Final Exam: TUES MAY 5 > 10:15 - 12:15 PM
*** However, being that we are working remotely, I will get a good sense of everyone's best time to come together and reveal the final project.
Followed by your final uploading images to FBsite
*** However, being that we are working remotely, I will get a good sense of everyone's best time to come together and reveal the final project.
Followed by your final uploading images to FBsite
- DUE Project #7 Student Directed Final Project
- DUE Project #7 COMPLETED with all uploads required onto FBsite
- DUE Project #7 Talking Points from assignment completed on FBsite
TUE MAY 12 Final Grades Due to Registrar*
*NOTE: This calendar is subject to change depending on the pace of the student populous overall. The professor has the right to make adjustments to this pacing schedule and will notify all students of any changes she sees fit.

